Basic Info.
Erection Position
Connected Scaffolding
Move Method
/
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Building Scaffold
Finishing
Zine Coated or as Your Customized
Size
Components for O.D.48/60mm Diameter Tubers
Usage
Fixed Scaffolding Pipe
Process
Forged & Pressed
Packing
Woven Bags + Steel Pallets
Certification
En74,BS1139 ...
MOQ
1000PCS
Price Terms
Fob, CIF,CFR
Payment Terms
T/T, L/C, and So on
Delivery Time
Within 15~30 Days After Receiving Deposit
Transport Package
Woven Bags + Steel Pallet
Specification
48*48/48*60/60*60mm
Trademark
TECON
Origin
China
HS Code
7308900000
Product Description
TECON Hot Sale 48.3*48.3mm Scaffolding Sleeve Coupler
Product Show
Product Introduction
TECON Hot Sale 48.3*48.3mm Scaffolding Sleeve Coupler, is the basic connection components for scaffoldings with O.D.48/60mm diameter tubes. It also plays a key role in setting up scaffold platform mainly by GI pipes.
Product Shows
Advantages of Our Products
• Used in areas where tension joints are required
• Suitable for use with ledger tubes & long bracing
• Coupler available with quality sheet metal
• Applicable for external connection of tubes
• Provide secure joints between tubes
Test Reports
Application
Join two scaffold tubes externally end to end. A steel divider located centrally ensures equal insertion of each tube.
They can be employed where tension joints are required and therefore are particularly useful for long bracing.
Production Flow
TECON-SC Series
Packaging & Delivery
Packaging Details
Woven bags + steel pallet
Strong and high pallets to avoid damage by fork lift, more steelstraps and thick plywoodpacking to protect materials inside and avoid damage during the shipment
Shipping
We have professional document and shipping department to provide the best service.
Pictures of Packaging & Shipping
FAQ
1.Q: Do you charge for the samples?
A: Free samples will be delivery to you as long as you are interested to TECON scaffolding couplers.
2.Q: How long can you get our samples?
A: The samples will be sent to you via express and arrive in 5-7 days.
You can use your own express account or prepaid to us if you don't have an account.
3.Q: How about the Delivery Time?
A: The goods will be produced since we getting your deposit by T/T.
4.Q: How is your guarantee for the quality?
A: 1) All goods are made of the quality material.
2) We will attach some relevant photos via email to you show our factory, machine and products.
3) All goods will be checked by our QC or your QC before deliver.
* Consultancy
Offer you a general idea of formwork & scaffold among TECON various systems, to fit your project demand.
* Technical Planning
Customized forming & shoring solution proposal according to your structural drawing by Auto-cad.
* Order Delivery
From fabrication to loading, fast to your site with standard export packages.
* On-site Supervision
Shop drawing, user manual, and even send our supervisor to your site for training and supervision.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
TECON Certification of Quality will be issued when the certain batch of products passes finished products inspection together with all QC profiles in previous phases.
Pre-shipment inspection will be also supported according to clients' request or by third-party.
Company Information
Thanks to TECON experienced technical team, safety, cost-effective and efficiency have already been considered even at the very beginning of product development.
At TECON, you will experience excellent one-stop service throughojut the whole phases of your projects, from budgeting to completion. We assist you with optimal technical planning, order delivering, on-site supervising, and even more than these.
We have a wide range of products line which covers wall formwork, slab formwork, column formwork, climbing formwork, slip formwork, girder, plywood, shoring prop, and all kinds of scaffoldings. They are widely used in residential & commercial buildings, fly-over roads, bridges, tanks, dams and other civil engineering projects.
TECON business is built on working with customers together and striving to satisfy all their requirements, with its know-how, reliable quality & in-time service.
TECON, for those who build.
Product Show
Product Introduction
TECON Hot Sale 48.3*48.3mm Scaffolding Sleeve Coupler, is the basic connection components for scaffoldings with O.D.48/60mm diameter tubes. It also plays a key role in setting up scaffold platform mainly by GI pipes.
Product Name | TECON Hot Sale 48.3*48.3mm Scaffolding Sleeve Coupler |
Material | Q235 |
Process | Forged & pressed |
Finishing | Zine Coated or as Your Customized |
Certification | First class ( two times hot press)EN74,BS1139,CE and also fit for our domestic standard, through SGS test. |
Size | Components for O.D.48/60mm Diameter Tubers |
Usage | Fixed Scaffolding Pipe |
MOQ | 1000pcs |
Price Terms | FOB, CIF,CFR |
Payment Terms | T/T, L/C, and so on |
Delivery Time | Within 7-15 days after receiving deposit |
Product Shows
Advantages of Our Products
• Used in areas where tension joints are required
• Suitable for use with ledger tubes & long bracing
• Coupler available with quality sheet metal
• Applicable for external connection of tubes
• Provide secure joints between tubes
Test Reports
Application
Join two scaffold tubes externally end to end. A steel divider located centrally ensures equal insertion of each tube.
They can be employed where tension joints are required and therefore are particularly useful for long bracing.
Production Flow
TECON-SC Series
Packaging & Delivery
Packaging Details
Woven bags + steel pallet
Strong and high pallets to avoid damage by fork lift, more steelstraps and thick plywoodpacking to protect materials inside and avoid damage during the shipment
Shipping
We have professional document and shipping department to provide the best service.
Pictures of Packaging & Shipping
FAQ
1.Q: Do you charge for the samples?
A: Free samples will be delivery to you as long as you are interested to TECON scaffolding couplers.
2.Q: How long can you get our samples?
A: The samples will be sent to you via express and arrive in 5-7 days.
You can use your own express account or prepaid to us if you don't have an account.
3.Q: How about the Delivery Time?
A: The goods will be produced since we getting your deposit by T/T.
4.Q: How is your guarantee for the quality?
A: 1) All goods are made of the quality material.
2) We will attach some relevant photos via email to you show our factory, machine and products.
3) All goods will be checked by our QC or your QC before deliver.
Our Service
Offer you a general idea of formwork & scaffold among TECON various systems, to fit your project demand.
* Technical Planning
Customized forming & shoring solution proposal according to your structural drawing by Auto-cad.
* Order Delivery
From fabrication to loading, fast to your site with standard export packages.
* On-site Supervision
Shop drawing, user manual, and even send our supervisor to your site for training and supervision.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
TECON Certification of Quality will be issued when the certain batch of products passes finished products inspection together with all QC profiles in previous phases.
Pre-shipment inspection will be also supported according to clients' request or by third-party.
Company Information
Thanks to TECON experienced technical team, safety, cost-effective and efficiency have already been considered even at the very beginning of product development.
At TECON, you will experience excellent one-stop service throughojut the whole phases of your projects, from budgeting to completion. We assist you with optimal technical planning, order delivering, on-site supervising, and even more than these.
We have a wide range of products line which covers wall formwork, slab formwork, column formwork, climbing formwork, slip formwork, girder, plywood, shoring prop, and all kinds of scaffoldings. They are widely used in residential & commercial buildings, fly-over roads, bridges, tanks, dams and other civil engineering projects.
TECON business is built on working with customers together and striving to satisfy all their requirements, with its know-how, reliable quality & in-time service.
TECON, for those who build.