Basic Info.
Product Description
Strong Construction Parts Adjustable Scaffolding Post Shoring Screw Base Jacks
some specification for reference :
Pipe | Plate | Weight |
M30(Solid) x 600mm | 120mm x 120mm x 4mm | 3.58kg |
M32(Solid) x 600mm | 140mm x 140mm x 4mm | 4.17kg |
M34(Solid) x 600mm | 150mm x 150mm x5mm | 4.94kg |
38(Hollow) x 4 x 600mm | 150mm x 150mm x 5mm | 3.39kg |
U-head :
Pipe | U-Head | Weight |
M30(Solid) x 600mm | 120mm x 150mm x 50mm x 4mm | 4.08kg |
M32(Solid) x 600mm | 120mm x 150mm x 50mm x 4mm | 4.51kg |
M34(Solid) x 600mm | 120mm x 150mm x 50mm x 4mm | 5.24kg |
38(Hollow) x 4 x 600mm | 150mm x 150mm x 50mm x 6mm | 4.29kg |
Nut:
Nut | Weight |
Nut Type A | 0.2kg |
Nut Type B | 0.25kg |
Nut Type C | 0.3kg |
Nut Type D | 0.4kg |
Scaffolding Accessories Base Jack/Screw Jack
1.Description Of Scaffolding Screw Jack
The Screw Jack is made from a 1 3/8 inch Solid Stem, or a 1 3/8 inch Hollow Tube, with 6" x 6" base & a large wing nut
4 adjustment. Thread Screw jacks are the accessory used to safely adjust the scaffold legs. This may be necessary when
different working heights are encountered or when the scaffold is mounted on sloped surfaces.
2.Requirement of scaffolding screw jack
a.High loading ability
b.Flexiable and safe
c.Long adjustable length
d.Precision shape
e.Keep a smooth stress
f.Various type and size
1.Can you provide sample for us? Yes, free sample is available
2. How do you ensure quality control?
we ensure the quality control by 2 steps:
1)after finish, our workers will check it one by one. 2)our package department will check before they pack.
3.How do you ship the goods to us?
We have the forwarder cooperated with us for 10 years, they can deliver the goods to you in very short time with competitive price,and you can ship by your own agent as your convinence.
4.Which country is your main market now?
Mid-East, North Africa, West Africa, South-east Asia, South America and Northern Europe district. Especially, a firm customer base in Saudi, Morocco, Nigeria, India, Bangladesh, and Russia etc.
5. How about your delivery time ?
15-30 days for Pipe.
6.how about your payment terms?
T/T,L/C,D/P.