Steel Q355b Hot DIP Galvanized Layher System Ringlock Scaffolding for Painting

Looking for top-quality steel Q355B hot dip galvanized Layher system ringlock scaffolding for painting? We are a factory that manufactures durable and reliable scaffolding products.
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
KP18
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Installation Scaffold
Certification
As1576/SGS/TUV
Surface Treatment
Hop Dipped Galvanization/Painted
Transport Package
Steel Pallet
Specification
2.4M/1.8M/1.2M/0.7M
Trademark
HDRL
Origin
China
HS Code
730840
Production Capacity
300000 Tons Per Year

Product Description

Steel Q355b Hot DIP Galvanized Layher System Ringlock Scaffolding for Painting


INTRODUCTION:

 Kwikstage is a versatile modular scaffolding and formwork support system widely using in Australia. New Zealand, UK, Ireland, and the Middle East.

Kwikstage scaffold includes tube and fitting method, which is a brilliant alternative to conventional types Kwikstage components vary depending on the region you are operating in. Such as in the UK, you have the component called return transom, but in Australia, they don't have this item.

Our products are designed to meet strict safety standards AS1576.1 and are well tested proven in the industry.


TABLE OF PRODUCTS PARAMETERS:
 
Place of Origin China
Brand Name HDRL
Size of Angle  230*63.5*1.8mm
Material Standard Pre-galvanized steel
Surface Treatment hot dipped galvanization or painted
Packaging Detail steel pallet, or packed in bundle
Delivery Detail 20-30 days after deposit.
Basic Components vertical standard, ledger, diagonal brace, transom, bracket, tie bar, ladder beam, base jack, steel plank, toe board bracket, end toe board bracket. aluminum stairs, handrail.
manufacturing OEM&ODM

Ringlock VERTICAL STANDARD:
 
Item No. Description Size          Weight (kgs)
KP24 Steel Plank 2.4m 2400mm 14.60
KP18  Steel Plank 1.8m  1800mm 11.60
KP12 Steel Plank 1.2m  1200mm 8.00
KP07 Steel Plank  0.7m  700mm 5.00

FACTORY PHOTOS:

Steel Q355b Hot DIP Galvanized Layher System Ringlock Scaffolding for Painting


PRODUCTS PHOTOS:


Steel Q355b Hot DIP Galvanized Layher System Ringlock Scaffolding for Painting
Steel Q355b Hot DIP Galvanized Layher System Ringlock Scaffolding for Painting










PRODUCTION PROCESS
Steel Q355b Hot DIP Galvanized Layher System Ringlock Scaffolding for Painting


CERTIFICATION
Steel Q355b Hot DIP Galvanized Layher System Ringlock Scaffolding for Painting


CUSTOMER VISITING


Steel Q355b Hot DIP Galvanized Layher System Ringlock Scaffolding for Painting



Steel Q355b Hot DIP Galvanized Layher System Ringlock Scaffolding for Painting

Q1: Are you a factory or trading company?    
A: We are a factory specializing in manufacturing all kinds of scaffolding material.

Q2: Where is the loading port?
A: Qingdao port or Tianjin port

Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one pallet is preferred.

Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS, and TUV certification.

Q5: Can I get some samples?    
A: Yes, Sample is free, but usually the customer will pay for the shipping cost. 

Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.

Q7: How long is the production cycle after ordering?
A: General it is about 20-30 days.

Q8: What is the payment methods?
A: T/T payment is preferred and other payment terms is accepted.


 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours