Basic Info.
Model NO.
SP88
Erection Position
External Scaffolding
Move Method
Installed and Fixed
Scaffolding Part Type
Scaffolding Planks
Construction Properties
Building Scaffold
Surface Treatment
Hot DIP Galvanized/Pre-Galvanized
OEM/ODM
Available
Validity
More Than 20 Years
Thickness
2.75mm/3.2mm
Delivery
About 20-30 Days After Deposit
Factory Certificate
ISO9001 ISO4001 ISO45001
Certificate
SGS,Ce
Application
Building/Tunnel/Bridge Construction
Loading Port
Tianjin or Qingdao
Raw Material
Steel Q355b,Q235B,Q195
Color
Silver/Red/Blue/Grey
Connect Method
Wedge Lock/Ring Lock
Way of Quoting
by Piece or by Weight
Sample
Available
Business Type
Manufacturer and Exporter
Transport Package
Steel Rack
Specification
240*45*600*1.5mm 240*45*900*1.5mm 240*45*1200*1.5
Trademark
HDRL
Origin
China
HS Code
73084000
Production Capacity
500 Tons/Day
Product Description









Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2: Where is the loading port?
A: Qingdao Port or Tianjin(Xingang) Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO9001, ISO14001, CE, SGS certification.
Q5: Can I get some samples?
A: Yes, usually the customer will pay for the cost and freight charge.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.