Hot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame Scaffolding

Get the best quality Hot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler. We are a factory direct supplier with durable and reliable products.
Request a Quote

PRODUCTS DETAILS

  • Overview
  • Product Description
  • Product Parameters
  • More products
  • Our workshop
  • Our Advantages
  • Certifications
  • Company Profile
  • Packaging & Shipping
Overview

Basic Info.

Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Building Scaffold
Size
48.3X76mm
Weight
1.9kg
Surface
Hot-DIP Galvanization, Electro Galvanization
Note
OEM Service Is Available
Application
Building Construction
Color
Silver or Customized
Scaffolding Parts
Scaffolding Coupler
Transport Package
Woven Bag, Pallet, Carton, Plywood Case
Specification
SGS, ISO9001
Trademark
FF
Origin
China
HS Code
73089000
Production Capacity
20 Containers Per Month

Product Description

Product Description

Scaffolding fasteners

1.Strong versatility and low cost.

2.High building height.

3.Easy and flexible to install.

4.Strong and durable, turnover more.

5.Available for outside and internal scaffolding.
Hot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame Scaffolding
Hot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame ScaffoldingHot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame ScaffoldingHot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame Scaffolding

Product Parameters

Item Drop Forged German Type Scaffold Coupler FF-0016
Material Q235
Dimensions 48.3X76mm
Weight 1.9kg
Surface Plating
Standard EN74
Note OEM service is available
MOQ 1Ton
Package in steel pallet ,carton, plywood case, or as your request  
Payment Terms TT, L/C, we can contact in detail
Delivery Time 20-30 days
 

More products

Hot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame Scaffolding

Our workshop

We have full set of production equipment, including model machine, punching machine, rolling machine, sand blasting and etc. These production equipments will show how the products are produced and we also can produce as your requirements using these equipments.

Research & Development
Our factory have our own R&D person and moulding workshop, all production problem and researching work could be solved and done by ourselves.

Hot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame Scaffolding

Our Advantages

Application scenario

Scaffolding coupler is used to assemble tube-and coupler scaffolding system.
♦ Restoration of buildings.
♦ maintenance of particularly complex or extremely deteriorated architectural works.


Quality Control
The Company has complete control procedure and system for product quality control, and has implemented strict quality control system in every step of the production from raw materials to finished products. We have several experienced inspectors to conduct sampling of semi-finished and finished products or do comprehensive inspection of whole process of production, all we do is to find unqualified products in time. It can not only ensure the product quality meeting the requirements of customers, but also stabilize the long-term sustainable development of the company.

Hot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame Scaffolding

Certifications

Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.

Hot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame Scaffolding
Why you choose us?
1)Highest quality -never use any equipment that is damaged or deteriorated in any way.
2)Safety -inspect all equipment before using.
3)Competitive price - factory suppler direct.
4)We have strong engineering team that can give best solution for your project.
5)Cutting -Edge product development.
Hot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame Scaffolding

Company Profile

Rizhao Fast & Fasten was established in 2004 and expanded three factories in 2020, and has a land area of about 23,000 square meters and nearly 200 workers. The company is located in Rizhao City, Shandong province, with advantageous geographical location and convenient transportation. It's only 1.5 hours to Qingdao port. 

Hot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame Scaffolding

Packaging & Shipping

Woven bag and pallet, plywood case, as your request.

Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.
All products are manufactured under stringent in - house quality control plansAll products strict quality inspection, all the raw materials are inspected before use, the product must be tested before leaving the factory.

Hot Sale Frame Construction Scaffolding Galvanized Steel Pipe Swivel Coupler for Frame Scaffolding
FAQ

Q1:Are you afactory or trading company?
A:We are a factory specializing in manufacturinf all kinds of scaffolding material.

 
Q2:Where is the loading port?
A:Qingdao


Q3:What's the MOQ of the product?
A:Different item has different MOQ.normally one pallet is preferred.

 
Q4:What certificates do you have?
A:We have  ISO9001, SIGMA issued certificate for scew jack and scaffold pipe clamp, and EN1090 certificate for welding system.

 
Q5:Can I get some samples?
A:Yes,Sample is free,but usually the customer will pay for the shipping cost.

 
Q6:Do you have an OEM service?
A:Yes.We can provide OEM and ODM services as your requirements.

 
Q7:How long is the production cycle after ordering?
A:General it is about 20-30 days.

 
Q8:What is the payment method?
A: 30% advanced payment and balanced against copy of BL or 100% L/C at sight, or negotiate according to the order status.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours