- Overview
- Product Description
- Detailed Photos
- More Products
- Company Profile
- Our Services
Basic Info.
Packaging & Delivery
Product Description
Hebei Factory Scaffolding Accessories Sleeve Coupler Out Joint
Coupler For Construction
Scaffolding Couplers or scaffolding clamps is the main part of the tubular scaffolding system, it
plays a fasten and connection functions in system. Simple structure and big loading power, make
couplers easier and widely used on construction project. Scaffolding couplers include swivel and
fixed coupler, forged and pressed coupler, etc.
Different couplers have their own unique characteristics and be used in different construction
situations.
Item | Specifications | Weight | Packing | |
Pressed Swivel Coupler | 48.6*48.6mm, 48.6*60mm | 560g/580g, 600g/630g | Carton and pallet | |
Pressed Fixed Double Coupler | 48.6*48.6mm, 48.6*60mm | 560g/580g, 600g/630g | Carton and pallet | |
Pressed Fixed Single Coupler | 48.6mm | 300g | Carton and pallet | |
BS1139/EN74 Pressed Swivel Coupler | 48.3*48.3mm | 0.98-1.0kg | Carton and pallet | |
BS1139/EN74 Pressed Fixed Coupler | 48.3*48.3mm | 0.8-0.85kg | Carton and pallet | |
BS1139/EN74 Drop Forged Swivel Coupler | 48.3*48.3mm | 1.12-1.15kg | Bag and pallet | |
BS1139/EN74 Drop Forged Double Fixed Coupler | 48.3*48.3mm | 0.98-1.0kg | Bag and pallet | |
BS1139/EN74 Drop Forged Board Rentaining Coupler | 48.3*48.3mm | 0.6-0.63kg | Bag and pallet | |
BS1139/EN74 Drop Forged Putlog Coupler | 48.3*48.3mm | 0.6-0.63kg | Bag and pallet | |
BS1139/EN74 Drop Forged Girder Coupler | 48.3*48.3mm | 1.45-1.5kg | Bag and pallet | |
BS1139/EN74 Pressed Sleeve Coupler&Joint Pin Coupler | 48.3*48.3mm | 0.92-0.98kg 0.62-0.65kg | Bag and pallet | |
BS1139/EN74 Pressed Ladder Coupler | 48.3*48.3mm | 0.46-0.5kg | Carton and pallet | |
BS1139/EN74 Pressed Joint Pin Coupler | 48*48mm | 0.65kg | Carton and pallet |
Pressed Scaffolding Couplers:
FORM TIE SYSTEM is widely used in the construction industry, due to its fast and easy assembly
and removal of the need for temporary formwork. The system prevents breakage in the formwork
and thus keeps concrete structures in good shape. It also saves construction costs, as all parts are
reusable except for the separator (inner unit) which is cast into the concrete structures.
The Form Tie System D Type consists of D Form Tie 2pcs,D Inner Unit 1pc, Plastic D Cone 2pcs,
Rib washers 2pcs and Hex Nut 2pcs.
The Form Tie System B Type consists of B Form Tie 2pcs, B Inner Unit 1pc, Plastic B Cone 2pcs,
Rib washers 2pcs and Hex Nut 2pcs.
Concrete Formwork Tie Rod System is used with various formwork accessories in concrete
construction. Tis system includesTie Rod, Formwork Wing Nuts, Concrete Anchor Nuts, Hex
Nuts, Connection Nuts, Washer Plates,Formwork Wedge Clamps, Formwork Spring Clamps,
Water Stopper/Water Barrier Nut, Combi Plate Nut, Plastic Cones, Plastic Tubes, etc.
All of these items are popularly used for concrete formwork & shuttering systems, including wall
formwork, column formwork, slab formwork, beam formwork, etc.
TRICO was founded in 2002. As an expert in the field of formwork and scaffolding,
TRICOis committed to providing better products and services to customers in the global
construction industry.
TRICO has a wide range of product lines, including the production and supply of full
system of building formwork, scaffolding and related components, and has realized
the "1+N" one-stop service mode. Theproducts sell well in more than 90 countries
and regions, winning the recognition and trust of business partners around the world.
TRICO's R&D team is experimenting and optimizing products every day. The endless
improvement and perfection is the gene of TRICO culture. TRICO's mission is to promote
the quality improvement, cost reduction and environmental protection and efficiency
enhancement of global buildings.
Let's work together to make it easier to build houses anywhere in the world!
- Formwork Tie Rod System
- Aluminium Formwork Wall Tie System
- Scaffolding System
- PP Hollow Plastic Formwork
- Steel Formwork Panel with Plywood Forming System
- Other Plastic Building Materials
1. Quality: Strictly control the quality through three levels. First level, quality test on the producing line.
Second level, quality test during warehousing. Third level, quality test before loading.
2. Timeliness: 24 hours online. Provide consulting and quotation services for customers all the time.
3. Veracity: Strictly follow the customer standard to ensure the tolerance range and meet customer's
requirement.
4. Integrity: If the customer complains about the quality of the products, our company will actively
cooperate with them to solve the problem. If it is the responsibility of our company, we will bear the
corresponding responsibility and compensation.
5. Longevity: Establish good long-term relationship with customers.