Basic Info.
Model NO.
ST369
Supporting Mode
Projecting Scaffolding
Lapping Form
Installed and Fixed
Erection Position
External or Internal Scaffolding
Move Method
Installed and Fixed
Scaffolding Part Type
Scaffolding Parts
Construction Properties
Installation or Building Scaffolding
Surface Treatment
Hot Dipped Galvanized/Pre-Galvanized
OEM/ODM
Available
Validity
More Than 15 Years
Thickness
2.75mm/3.2mm
Delivery
About 10-20 Days After Deposit
Factory Certificate
ISO9001 ISO4001 ISO45001
Certificate
CE/SGS
Application
Building/Tunnel/Bridge Construction
Raw Material
Steel Q345b, Q235B
Color
Silver Red Blue Grey
Connect Method
Wedge Lock/Ring Lock
Way of Quoting
by Piece or by Weight
Sample
Available
Business Type
Manufacturer and Exporter
Loading Port
Tianjin or Qingdao
Transport Package
Steel Rack
Specification
500mm 1000mm 1500mm 2000mm 2500mm 3000mm
Trademark
HDRL
Origin
China
HS Code
73084000
Production Capacity
500 Tons/Day
Product Description
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2: Where is the loading port?
A: Qingdao Port or Tianjin(Xingang) Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS certification.
Q5: Can I get some samples?
A: Yes, usually the customer will pay for the cost and freight charge.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.