Basic Info.
Model NO.
HZF-860
Erection Position
External Scaffolding
Move Method
Horizontal Mobile Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Building Scaffold
Size
48.3-48.9
Name
Scaffold Coupler
Delivery Date
15-30 Days
Weight
550-650g
Transport Package
Crate or Plywood Case or as Customers′ Request
Specification
SGS/ISO900/BV
Trademark
HZF
Origin
Shandong, China
HS Code
84089452
Production Capacity
50000 PCS/Month
Product Description
British Drop Forged scaffolding coupler
1.Detail:
2. Stamping & Forging Process
3. Inspection:
FAQ
1. How can I get the quotation ?
Please send us information for quote : drawing, material, weight, quantity and request.
2. How long will be taken for sample production ?
Sample : 20-30 days for making mold and sample production . The accurate time depends on your product.
3. Can you accept Mini order ?
Yes . Mini order and trial order can be acceptable .
4. What is your Payment Term ?
Mold cost : 100% TT advanced.
Main order : 40% deposit, balance 60% to be paid against the copy of B/L .
Contact us Today :
1.Detail:

Dimensions: | 48.3*48.3mm 48.6*48.6mm |
Thickness: | 2.5-3mm |
Material: | Q235 |
Nut sizes | With T-bolt ,17mm, 19mm, 21mm, 22mm, 23mm with flange or not |
Standard | EN74,BS1139,CE and also fit for our demostic stardand , through SGS test. |
surfaces | can be self-colored, galvanized, gold color galvanized, or hot dipped galvanized |
Technic | Forged |
Standard | EN74,BS1139,CE and also fit for our demostic stardand , through SGS test. |
2. Stamping & Forging Process


3. Inspection:

FAQ
1. How can I get the quotation ?
Please send us information for quote : drawing, material, weight, quantity and request.
2. How long will be taken for sample production ?
Sample : 20-30 days for making mold and sample production . The accurate time depends on your product.
3. Can you accept Mini order ?
Yes . Mini order and trial order can be acceptable .
4. What is your Payment Term ?
Mold cost : 100% TT advanced.
Main order : 40% deposit, balance 60% to be paid against the copy of B/L .
Contact us Today :
