Aus/Nz Standard Galvanized Scaffolding for Outdoor Construction

Our Aus/Nz Standard Galvanized Scaffolding for Outdoor Construction is perfect for your next project. As a factory, we ensure high quality and durability.
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
MSG SF1
Supporting Mode
Floor Type Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Building Scaffold
Surface Finish
Hot DIP Galvanized
Material Available
Q235, Q345, Galvanized Steel, Alloy
Colour
Metallic
Dimension
as Per Customer′s Requirement
MOQ
10 Tons
Application
Building, Mall, Factory, Pavilion
Lead Time
25-40 Days
Service
OEM/ODM
Packaging
in Bulk with Pallet
Selling Point
Durable, Easy to Assemble
Transport Package
in Bulk with Pallet
Specification
AUS/ NZ standard
Trademark
OEM/ ODM Logo
Origin
Jiangmen
Production Capacity
1000tons/Month

Product Description

Hot Dip Galvanized Kwikstage Scaffolding System under AUS/NZ  standard for outdoor building construction:
Aus/Nz Standard Galvanized Scaffolding for Outdoor Construction
Aus/Nz Standard Galvanized Scaffolding for Outdoor Construction



Aus/Nz Standard Galvanized Scaffolding for Outdoor Construction
Feature:

1. Material: Steel or Aluminium Alloy at customer's requirement;

2. Hop Dip Galvanized, durable for outdoor usage

3. Top quality and reasonable price

4. Easy to Assemble,Flexible

5. Various Sizes, Colours available at customer's design

6. Packaging: In bulk with metal Pallet

7. OEM Orders are welcomed

8. Own inspection team for quality control, sending detailed inspection report before shipment

9. Other Steel Construction projects available:  Stairs, Handrail, Scaffolds, Screening, Fence, Door Frame, etc.

Packaging & Delivery:

Packaging Detail: In Bulk with Pallet
Lead Time: 20-25 working days



 FAQ:
 
1. Q: Can you make our custom brand logo?
   A: Yes, we accept OEM/ODM service.


2. Q: Can you offer free sample?
   A: Sample fee would be needed for our sample production, but money will be returned if you place order with us. Freight Charge for sample delivery would be collected on your side.

3. Q: How long to make a sample ?
   A: 15-30days depending on the design.

4. Q: How about lead time?
   A: Normally around 20-35 days upon order confirmation.

5. Q: Can you offer me a discount?
   A: Cost would be lower depending on quantity, usually  the more you order the cheaper we offer.

6. Q: What about your payment term?
 A: For your first order, we accept 30%TT down payment only, the rest TT/LC at sight. For future order, other payment terms would be available upon discussion.

7. Q: Can we visit your factory?
 A: Certainly, customers are always welcomed to visit. Please make an appointment in advance.

8. Q: How far away your factory?
 A: Our factory is located in Jiangmen city, Guangdong, China. It is quite closed to Guangzhou/Shenzhen/Zhongshan/Zhuhai/Dongguan. It would take less than 2 hours by driving from Guangzhou Airport to our factory.

9. Q: Where the near ports can be chose?
 A: Jiangmen Port/Zhongshan Port/Huangpu Port/Nanshan port/Yantian Port,etc.

10. Q: Other more question?
 A: Please contact us by email if you have any question.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours