- Overview
- Product Description
- Packaging & Shipping
- Company Profile
- FAQ
Basic Info.
Product Description
Item | A (Width) | B (Height) | |
Main Frame Outer tube: 42*2.2mm/2.0mm/1.8mm Inner tube: 25*1.5mm/1.8mm/2.0mm | 1219mm | 1524mm | |
1219mm | 1700mm | ||
1219mm | 1930mm | ||
914mm | 1524mm | ||
914mm | 1700mm | ||
914mm | 1930mm |
Item | A (Width) | B (Height) | |
H Frame Outer tube: 42*2.2mm/2.0mm/1.8mm Inner tube: 25*1.5mm/1.8mm/2.0mm | 1219mm | 914mm | |
1219mm | 1219mm | ||
1219mm | 1524mm | ||
1219mm | 1700mm | ||
1219mm | 1930mm | ||
914mm | 914mm | ||
914mm | 1219mm | ||
914mm | 1524mm | ||
914mm | 1700mm | ||
914mm | 1930mm |
Item | A (width) | B (height) | C (length) | |
Cross Brace 21.3*1.0mm/1.2mm/1.4mm | 1829mm | 1219mm | 2198mm | |
1219mm | 1219mm | 1724mm | ||
1829mm | 914mm | 2045mm | ||
1829mm | 610mm | 1928mm | ||
1219mm | 610mm | 1363mm | ||
Item | Size | |||
Joint Pin | 36*1.5*225mm | |||
36*1.2*225mm | ||||
36*1.0*225mm |
1. Location: Tangshan Wufang is leading scaffolding manufacturer, located in Tangshan, Hebei Province, the raw material basement.
2. Team: We have professional team for sale, project design and construction.
3. Main products: Ringlock Scaffolding, Frame Scaffolding, Steel Plank, Catwalk, Ladders, Pipe & Clamp, Steel Prop, etc.
4. Production capacity: 7000-10000 Tons/month.
5. Loading capacity: 8-12 containers/day.
6. Delivery time: 10-15 days for 3-5 containers.
Fast delivery to satisfy your urgent project demand.
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing scaffolding material.
Q2: Where is the loading port?
A: Tianjin(Xingang) Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, SGS certification.
Q5: Can I get some samples?
A: Yes, but usually the customer will pay for the cost and freight charges.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.