Basic Info.
Model NO.
Rolling Scaffold Stair Tower
Supporting Mode
Floor Type Scaffolding
Lapping Form
Double Scaffolding
Erection Position
Internal or External Scaffolding
Move Method
Horizontal mobile Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Building Scaffold
OEM
Yes
ODM
Yes
Color
Customized
Surface
DIP Painted
Diameter
42mm
Thickness
2.0/2.2mm
Welding
Carbon Dioxide Protection
Life Span
3-5 Years
Transport Package
in Bare Package
Specification
Customized
Trademark
Jianyi
Origin
Foshan
HS Code
7304800000
Production Capacity
2000 Tons Per Month
Product Description
1930*1219 aluminium mobile Rolling Scaffold Stair Tower
1.Features:
a.Easily assembled,fast erection and dismantling.
b.High-strength steel tube,safe,durable and dependable.
c.Large selection of ringlock lock size.
d.Special brace lock spacing to match existing inventory.
e.Ringlock scaffolding for stories stacking.
d.Short delivery time,with stock.
2.Specifications:
b.High-strength steel tube,safe,durable and dependable.
c.Large selection of ringlock lock size.
d.Special brace lock spacing to match existing inventory.
e.Ringlock scaffolding for stories stacking.
d.Short delivery time,with stock.
2.Specifications:
Name | 1930*1219 aluminium mobile Rolling Scaffold Stair Tower | ||||
Place of Origin | Foshan,China | ||||
Brand | Jianyi | ||||
Size (more customized size available) | Type | Height(mm) | Width(mm) | Tube Thickness(mm) | |
LF1700 | 1700 | 1219 | 2/2.2 | ||
LF1219 | 1219 | 1219 | 2/2.2 | ||
LF1524 | 1524 | 1524 | 2/2.2 | ||
LF914 | 914 | 1219 | 2/2.2 | ||
Material | Q235 steel | ||||
Surface treatment | Hot Dip Galvanized(HDG);Cold galvanized;Powder coated;Dip painted | ||||
Color | Blue,or as you required | ||||
Welding technique | CO2 arc Welding | ||||
Certification | SGS | ||||
MOQ (Minimum Order Quantity) | 1 20ft container;please contact us if you need less than 1 20ft container. | ||||
Payment | T/T | ||||
Delivery time | 20days after deposit | ||||
Package | Without outer packing or as you required | ||||
Production capacity | 100 tons for each day | ||||
Package Details | Container Loading Capacity | ||||
Type | 20GP | 40HQ | |||
1930*1219 Frame Scaffolding | 200sets | 550sets | |||
1700*1219 Frame Scaffolding | 250sets | 600sets | |||
1219*1219 Frame Scaffolding | 230sets | 600sets | |||
914*1219 Frame Scaffolding | 330sets | 850sets | |||
1524*1524 Ladder Frame Scaffolding | 120sets | 300sets | |||
1700*1219 Ladder Frame Scaffolding | 160sets | 375sets | |||
PKG: | cross brace | 5 pairs in one bundle | |||
joint pin | 10pcs in one bundle |
Export Europe Type Scaffolding Materials Full Frame Set
Features of Disc Ringlock Scaffolding:
1 Simply,Light,Easy to handle
2 Easy,Quickly erected and dismantled
3 Vertical and Horizontal Easy to Control
4 Easy to transport
5 Minimum number of components
6 Ledger Supports all types of slab and beam
7 Multi-function:Simple pipe,Frame,Work bracket,stage,shoring etc
Product Name | Export Europe Type Scaffolding Materials Full Frame Set |
Place Of Original | Foshan China |
Major component | Standards,Ledger,Diagonal Brace-s,U Head and Base Jack,Disc,Connect Pin,Stairs,Planks Etc. |
Tube diaeter | 48mm |
Tube thickness | 3.0/3.25mm |
Vertical tube length | 500/1000/1500/2000/2500/3000mm or OEM |
Ringlock Scaffold Material | Q235 steel/Q345 |
Surface Treatment | Galvanized,Dip Painting,Powder coated |
Color | Oranger,Blue,Yellow,Green,Silver or as you request |
Certificate | SGS,CE,ISO9001 |
Service | ODM OEM Service |
MOQ | 1 Tons |
Payment | T/T.West Union,Cash |
Delivery Time | About 7-100 days after confirmation |
Packing | in bulk or steel pallet or as your request |
production capability | 100 tons per day |
Manufactory Location | Foshan,China. |
Flexibility Construction Equipment Steel H Frame Scaffold
1.Features:
a.H frame steel scaffolding are designed to be gate type for people to easily walk through the construction platform.
b.H frame steel scaffolding require easy assembly.One set frame scaffolding can be simply installed by one person within a few minutes.
c.CO2 arc welding technique protects the welding parts of H frame steel scaffolding from deformation and corrosion.
d.A set of H frame steel scaffolding has 2 pieces of welded main frames, 4 pieces of connecting pins and 2 pairs of cross braces.
2.Specifications
b.H frame steel scaffolding require easy assembly.One set frame scaffolding can be simply installed by one person within a few minutes.
c.CO2 arc welding technique protects the welding parts of H frame steel scaffolding from deformation and corrosion.
d.A set of H frame steel scaffolding has 2 pieces of welded main frames, 4 pieces of connecting pins and 2 pairs of cross braces.
2.Specifications
Name | Steel H Frame Scaffold |
Place of Origin | Foshan,China |
Brand Name | Jianyi |
Material | Q235 steel pipe |
Certificate | SGS |
Surface Treatment | Hot dip galvanized,Galvanized,Powder coated,Dip painted |
Color | Silver,Orange,Red,or as your request |
Features | R shaped cutting small steel tube |
Service | OEM service available |
MOQ | 50sets |
Payment | T/T, L/C, Western Union, MoneyGram |
Delivery Time | About 15-30 days after confirmation |
Packing | In bulk,steel pallet or as your request |
Production Capability | 200 tons per day |
Project:
Main products:
Our services:
1.Your inquiry related to our product & price will be replied within 24hours.
2.Well-trained & experienced staffs are to answer all your inquiries professional in English of course.
3..All of our goods will pass THREE QUALITY INSPECTIONS before shipment.
4.Excellent quality and Competitive price,OEM is highly welcomed.We have strong R&D team here to help.
5.Less than one container loading is accepted
6.On time delivery, in general 25-40 days.
7.Best after sale service, customer can follow their order situation any time, no matter on product line, warehouse or shipm
Contact us:
If you have any questions, pls feel free to contact us,
Any your requirements will be highly appreciated!
Contact: Brian Zhang
Mobile phone/whatsapp:+8613715503995 Mr zhang
Main products:
Our services:
1.Your inquiry related to our product & price will be replied within 24hours.
2.Well-trained & experienced staffs are to answer all your inquiries professional in English of course.
3..All of our goods will pass THREE QUALITY INSPECTIONS before shipment.
4.Excellent quality and Competitive price,OEM is highly welcomed.We have strong R&D team here to help.
5.Less than one container loading is accepted
6.On time delivery, in general 25-40 days.
7.Best after sale service, customer can follow their order situation any time, no matter on product line, warehouse or shipm
Contact us:
If you have any questions, pls feel free to contact us,
Any your requirements will be highly appreciated!
Contact: Brian Zhang
Mobile phone/whatsapp:+8613715503995 Mr zhang